1. What is initial verification intended to confirm?
2. An initial verification inspection should verify what 3 things?
3. What 3 forms are available for the certification of a new installation or for an alteration or addition to an existing installation?
4. Under what circumstances can a minor electrical installation works certificate be used?
5. List 5 pieces of information that must be made available to the inspector?
6. Who recommends the period of time from Initial Verification to the first Periodic Inspection and who would recommend the subsequent period of time between inspections?
7. On a new installation when is the inspection carried out?
8. List 5 of the 17 items from the list of items to be checked during initial inspection.
9. List the 3 types of conductor used to satisfy ADS.
The answers to the questions above are mainly contained in Guidance Note 3 although some cross reference to BS 7671 or the On Site Guide may be necessary.